Sign in
Changzhou Jianneng Pinzhi Mechanical & Electrical Co., Ltd.
4YRSChangzhou Jianneng Pinzhi Mechanical & Electrical Co., Ltd.

COMPANY OVERVIEW

Company Album

Basic Information

PRODUCT CAPACITY

Production Flow

Crankshaft assembly processing
Before the crankshaft is installed, the gears and bearings need to be assembled through the hydraulic equipment and then into the box for installation.
Side cover assembly processing
Before installing the diesel engine side cover, it is necessary to assemble the main shaft pad and bearing through the hydraulic equipment and wait for the box to be installed.

Production Equipment

Name
No
Quantity
Verified
Electric oven
D3000
3
Vertical air cold press machine
YZ280
3
Screw air compressor
JZV20A
3
Automatic flat line
XK-SB36
8
Verified

Factory Information

Factory Size
5,000-10,000 square meters
Factory Country/Region
No. 22, Jiangdong Road, Wujin District, Hutang Town, Changzhou City, Jiangsu Province, China
No. of Production Lines
8
Contract Manufacturing
OEM Service Offered, Design Service Offered, Buyer Label Offered
Annual Output Value
US$1 Million - US$2.5 Million

Facilities

Facilities
Supervisor
NO.of Operators
NO.of In-line QC/QA
Verified
Diesel generator assembly line
3
15
2
Diesel engine assembly line
2
25
2
Diesel engine test line
1
5
1
Diesel generator test line
1
3
1
Machining line
1
5
1
Packaging production line
1
6
1
Verified

QUALITY CONTROL

Quality Management Process

Diesel generator power test
After the diesel generator goes offline, it is required to carry the load test for more than 3 minutes and pass the factory.

Test Equipment

Machine Name
Brand & Model NO
Quantity
Verified
Hydraulic dynamometer
DY30
2
Power cabinet
XL-21
5
Dji drone
T30
1
Verified