Sign in
Changzhou Jianneng Pinzhi Mechanical & Electrical Co., Ltd.
3YRSChangzhou Jianneng Pinzhi Mechanical & Electrical Co., Ltd.

Descripción de la compañía

Álbum de la compañía

Información básica

Capacidad del producto

El flujo de producción

Crankshaft assembly processing
Before the crankshaft is installed, the gears and bearings need to be assembled through the hydraulic equipment and then into the box for installation.
Side cover assembly processing
Before installing the diesel engine side cover, it is necessary to assemble the main shaft pad and bearing through the hydraulic equipment and wait for the box to be installed.

El equipo de producción

Nombre
No
Cantidad
Verificado
Electric oven
D3000
3
Vertical air cold press machine
YZ280
3
Screw air compressor
JZV20A
3
Automatic flat line
XK-SB36
8
Verificado

Información de fábrica

Tamaño de la fábrica
5,000-10,000 square meters
Ubicación de la fábrica
No. 22, Jiangdong Road, Wujin District, Hutang Town, Changzhou City, Jiangsu Province, China
N° de líneas de producción
8
Fabricación por contrato
OEM Service Offered, Design Service Offered, Buyer Label Offered
Valor de producción anual
US$1 Million - US$2.5 Million

Línea de producción

Línea de producción
Supervisor
NO, de los operadores
NO, de en-línea QC/QA
Verificado
Diesel generator assembly line
3
15
2
Diesel engine assembly line
2
25
2
Diesel engine test line
1
5
1
Diesel generator test line
1
3
1
Machining line
1
5
1
Packaging production line
1
6
1
Verificado

Control de Calidad

Proceso de control de calidad

Diesel generator power test
After the diesel generator goes offline, it is required to carry the load test for more than 3 minutes and pass the factory.

Equipo de prueba

Nombre de la máquina
Marca y modelo NO
Cantidad
Verificado
Hydraulic dynamometer
DY30
2
Power cabinet
XL-21
5
Dji drone
T30
1
Verificado