Sign in
4YRSChangzhou Jianneng Pinzhi Mechanical & Electrical Co., Ltd.

कंपनी अवलोकन

कंपनी एलबम

बुनियादी जानकारी

उत्पाद क्षमता

उत्पादन प्रवाह

Crankshaft assembly processing
Before the crankshaft is installed, the gears and bearings need to be assembled through the hydraulic equipment and then into the box for installation.
Side cover assembly processing
Before installing the diesel engine side cover, it is necessary to assemble the main shaft pad and bearing through the hydraulic equipment and wait for the box to be installed.

उत्पादन उपकरण

नाम
कोई
मात्रा
सत्यापित
Electric oven
D3000
3
Vertical air cold press machine
YZ280
3
Screw air compressor
JZV20A
3
Automatic flat line
XK-SB36
8
सत्यापित

फैक्टरी जानकारी

फैक्टरी का आकार
5,000-10,000 square meters
फैक्टरी का स्थान
No. 22, Jiangdong Road, Wujin District, Hutang Town, Changzhou City, Jiangsu Province, China
उत्पादन लाइनों की संख्या
8
अनुबंध विनिर्माण
OEM Service Offered, Design Service Offered, Buyer Label Offered
वार्षिक उत्पादन मूल्य
US$1 Million - US$2.5 Million

उत्पादन लाइन

उत्पादन लाइन
पयर्वेक्षक
कोई. ऑपरेटरों की
की संख्या में-लाइन क्यूसी/क्यूए
सत्यापित
Diesel generator assembly line
3
15
2
Diesel engine assembly line
2
25
2
Diesel engine test line
1
5
1
Diesel generator test line
1
3
1
Machining line
1
5
1
Packaging production line
1
6
1
सत्यापित

गुणवत्ता नियंत्रण

गुणवत्ता प्रबंधन की प्रक्रिया

Diesel generator power test
After the diesel generator goes offline, it is required to carry the load test for more than 3 minutes and pass the factory.

परीक्षण उपकरण

मशीन का नाम
ब्रांड और मॉडल कोई
मात्रा
सत्यापित
Hydraulic dynamometer
DY30
2
Power cabinet
XL-21
5
Dji drone
T30
1
सत्यापित