Before the crankshaft is installed, the gears and bearings need to be assembled through the hydraulic equipment and then into the box for installation.
Side cover assembly processing
Before installing the diesel engine side cover, it is necessary to assemble the main shaft pad and bearing through the hydraulic equipment and wait for the box to be installed.
生産設備
名前
いいえ
数量
検証済み
Electric oven
D3000
3
Vertical air cold press machine
YZ280
3
Screw air compressor
JZV20A
3
Automatic flat line
XK-SB36
8
検証済み
工場情報
工場規模
5,000-10,000 square meters
生産国/地域
No. 22, Jiangdong Road, Wujin District, Hutang Town, Changzhou City, Jiangsu Province, China
生産ライン数
8
契約製造
OEM Service Offered, Design Service Offered, Buyer Label Offered
年間生産額
US$1 Million - US$2.5 Million
生産ライン
生産ライン
監督者
運転者番号
生産ラインQC/QA番号
検証済み
Diesel generator assembly line
3
15
2
Diesel engine assembly line
2
25
2
Diesel engine test line
1
5
1
Diesel generator test line
1
3
1
Machining line
1
5
1
Packaging production line
1
6
1
検証済み
品質管理
品質管理プロセス
Diesel generator power test
After the diesel generator goes offline, it is required to carry the load test for more than 3 minutes and pass the factory.