Sign in
Changzhou Jianneng Pinzhi Mechanical & Electrical Co., Ltd.
3YRSChangzhou Jianneng Pinzhi Mechanical & Electrical Co., Ltd.

ŞİRKETE GENEL BAKIŞ

Şirket Albümü

Temel Bilgiler

ÜRÜN KAPASİTESİ

Üretim Akışı

Crankshaft assembly processing
Before the crankshaft is installed, the gears and bearings need to be assembled through the hydraulic equipment and then into the box for installation.
Side cover assembly processing
Before installing the diesel engine side cover, it is necessary to assemble the main shaft pad and bearing through the hydraulic equipment and wait for the box to be installed.

Üretim Ekipmanı

Ad
Hayır
Miktar
Doğrulandı
Electric oven
D3000
3
Vertical air cold press machine
YZ280
3
Screw air compressor
JZV20A
3
Automatic flat line
XK-SB36
8
Doğrulandı

Fabrika Bilgileri

Fabrikanın Büyüklüğü
5,000-10,000 square meters
Fabrikanın Bulunduğu Ülke/Bölge
No. 22, Jiangdong Road, Wujin District, Hutang Town, Changzhou City, Jiangsu Province, China
Üretim Hatlarının Sayısı
8
Sözleşmeli Üretim
OEM Service Offered, Design Service Offered, Buyer Label Offered
Yıllık Çıktı Değeri
US$1 Million - US$2.5 Million

Üretim Hattı

Üretim Hattı
Danışman
Operatör Sayısı
Sıralı QC/QA sayısı
Doğrulandı
Diesel generator assembly line
3
15
2
Diesel engine assembly line
2
25
2
Diesel engine test line
1
5
1
Diesel generator test line
1
3
1
Machining line
1
5
1
Packaging production line
1
6
1
Doğrulandı

KALİTE KONTROL

Kalite Yönetimi Süreci

Diesel generator power test
After the diesel generator goes offline, it is required to carry the load test for more than 3 minutes and pass the factory.

Test Ekipmanı

Makine Adı
Marka ve Model NO
Miktar
Doğrulandı
Hydraulic dynamometer
DY30
2
Power cabinet
XL-21
5
Dji drone
T30
1
Doğrulandı